← Services

EV chargers, solar and battery.

Home charging, solar panels and battery storage wired as one system, with the supply checks, notifications and paperwork done for you.

B40

EV charger

B16

Solar PV

B32

Battery

B40

Supply

Charge, generate, store.

B40

EIC + DNO

Home EV charger installation

A smart 7kW charger on the drive or garage wall, with load management so it never overloads your incoming supply. We check your main fuse, earthing and route before quoting.

B16

G98/G99

Solar PV

Panels, inverter and isolation installed and commissioned, with clear labelling at the board.

B32

EIC

Battery storage

Store daytime solar or cheap overnight tariffs and run the house on it at peak times.

B40

EIC

Supply upgrades

Main fuse and meter tail upgrades arranged with your network operator when the load needs it.

B6

MEIWC

Smart tariffs and monitoring

Chargers and batteries set up to work with time-of-use tariffs and your app.

B32

EIC

Battery-ready wiring

Not ready for a battery yet? We leave the space and wiring so adding one later is simple.

Have an EV or one on order

Charge from a three-pin plug or extension lead

Are home during the day or on a time-of-use tariff

Have a south, east or west facing roof

Want to cut peak-time electricity use

Are replacing an old fuse board anyway

Worth doing if you:

A survey tells you whether your supply, board and earthing are ready, and what it would cost if not.

Book a survey
Solar panels on the roof of a modern house

What you get at the end.

A supply and earthing check

We confirm the property can take the load before anything is ordered.

Network operator paperwork

DNO notification for chargers and G98 or G99 applications for generation.

Certificates and handover

EIC, commissioning records and a walk-through of the app and isolators.

Manufacturer warranty registration

Registered in your name so you deal with the maker directly if you ever need to.

Can my house take an EV charger?

Most can. We check the main fuse size, existing load and earthing. Load management usually avoids any supply upgrade.

Do I need permission for solar?

Most domestic roof installs are permitted development. Listed buildings and conservation areas need checking first, and we will tell you if yours does.

How long does an EV charger install take?

Usually half a day. Longer cable runs or a board upgrade can make it a full day.

Will a battery work in a power cut?

Only if the system is specified for backup. We will explain the options and costs before you decide.

EV and solar questions.

All FAQs

Main switch on.

Tell us about the job and we will send a fixed price within one working day.

Request received. We will call you within one working day with a fixed price.

100A

Main switch

Goes on when you start your request